MG MG4 Running Costs (2026)

What it really costs to charge and run a MG MG4by country, vs petrol.

Updated 24 June 2026 · € / 100 km · figures current to Q2 2026

€1.94–€5.71Charging cost / 100 kmhome power · Bulgaria → Germany
€9–€26Full 0→100% home charge61.7 kWh ÷ 0.9 wall draw
14.9kWh / 100 kmreal-world (ev-database)
450 kmWLTP range61.7 kWh battery

Charging cost — by country

At average residential electricity prices, 14.9 kWh/100 km (wall, incl. ~10% charging loss). Annual = 15,000 km/year.

Country€/kWh€/100 kmFull charge€/yr (15,000 km)
🇧🇬 Bulgaria0.1300€1.94€8.91€291
🇵🇱 Poland0.2560€3.81€17.55€572
🇪🇸 Spain0.2610€3.89€17.89€583
🇫🇷 France0.2660€3.96€18.24€595
🇩🇪 Germany0.3835€5.71€26.29€857
Sources: Eurostat, electricity price statistics H1 2025 (residential, incl. all taxes). Cost / 100 km = efficiency × tariff; full charge = battery ÷ 0.9 × tariff.

Your exact cost in 10 seconds

Pre-filled for the MG4 (61.7 kWh, 14.9 kWh/100 km). Pick your country, tariff and mileage for your real monthly & 5-year cost.

Open MG4 calculator →

EV vs petrol

MG4 (Germany)
€5.71/100 km
VW Golf 8 1.5 eTSI 150hp (segment benchmark) (Germany)
€10.01/100 km

VW Golf 8 1.5 eTSI 150hp (segment benchmark): 5.5 L/100 km (WLTP) × €1.82/L. MG4 runs 43% cheaper per km in Germany, 57% on average across the EU.

MG MG4 — key specs

Usable battery61.7 kWh
WLTP range450 km
Efficiency (real-world)14.9 kWh/100 km
DC fast charge (max)142 kW
10–80% DC time25 min
AC onboard charger6.6 kW
Price from (DE)€39,990

Frequently asked questions

How much does it cost to charge a MG MG4 at home?

A full 0→100% home charge of the 61.7 kWh battery costs about €9 in Bulgaria and €26 in Germany (battery ÷ 0.9 for ~10% AC charging loss). Per 100 km that is €1.94–€5.71.

What is the MG4 cost per 100 km?

On home electricity the MG4 costs €1.94 per 100 km in Bulgaria (cheapest) up to €5.71 in Germany (priciest), based on real-world 14.9 kWh/100 km.

Is the MG4 cheaper to run than petrol?

Yes — on energy it runs about 57% cheaper per km than a comparable VW Golf 8 1.5 eTSI 150hp (segment benchmark), before lower maintenance and any incentives. Across 15,000 km/year that is a meaningful annual saving in every market shown.

How long does the MG4 take to fast-charge?

It charges at up to 142 kW on DC, taking about 25 minutes from 10–80%, and up to 6.6 kW on a home/AC wallbox.

Sources

Methodology: cost = efficiency × tariff; a full 0→100% home charge draws battery ÷ 0.9 (≈10% AC charging loss). EU in €/100 km; reproducible from the figures above. Excludes maintenance, insurance, depreciation and public fast-charging. Educational — not financial advice.

← All EV running-cost models